Trusted Demolition Contractors NYC
Call Now (866) 504-7822
99 HUDSON STREET STE 520 NEW YORK, NY 10013
Mail : service@deltademolitioncontractor.com
  • Home
  • Emergency Demolition
  • Junk Removal
  • Blogs
  • Contact Us

Please get in touch with us to arrange a consultation and initiate the first stage of a streamlined and effective demolition process in New York City.

Call Now

(866) 504-7822

Mail

service@deltademolitioncontractor.com

Location

99 HUDSON STREET STE 520 NEW YORK, NY 10013

Follow Us On

How Do Demolition Contractors Ensure Safety on Site?

Demolition Contractors in NYC

The demolition projects are not particularly safe, that’s why we need professionals for such tasks. Demolition contractors always have plans for ensuring the safety of all the stakeholders whenever they disassemble a building. 

In this article, we will explore how Demolition contractors NYC maintain safety when they take on a project. 

Create a Plan 

Demolition is not a reckless job, it demands proper planning. So, before starting any demolition project it is crucial to create an engineered plan. The plan should include: 

  • Type of the building 
  • Location of the building 
  • List of any potential hazard 

Next, the contractor will create a plan for deconstructing the building. A plan will ensure that all the stakeholders are safe during the execution of the task. Also, a thought-out plan can help reduce the risk of accidents and injuries. 

A plan is also crucial because the Occupational Safety and Health Administration (OSHA) demands an engineering survey before any demolition project. The survey must include:

  • List of any structural deficiencies in framing, floors, or walls
  • Indicate if there is any threat of collapse 
  • A written form of the complete survey 

Job Safety Analysis

After getting the engineering plan it’s time to do the Job Safety Analysis (JSA). A JSA helps in determining other threats related to health or physical issues. For instance, is the building exposed to lead, asbestos, or silica? 

If any potential threat is found the OSHA instructs to do the following activities: 

  • Isolated the task 
  • Find the root cause of hazard or hazards 
  • Create a plan for controlling the hazard

A contractor is a professional and experienced person if he focuses on creating a well-thought-out engineering plan and also performs JSAs regularly. It is a positive indication that the company cares about the environment and all the stakeholders.   

Also Read: Why Breaking Windows Before Demolition is Important?

Train Your Workers 

Proper employee training is vital for demolition projects. All employees should know the procedure of the work and the hazards they may face on the project site. They should know how to use personal protection equipment and emergency evacuation procedures. If training is ignored, employees may get injured or may hurt someone else during work. So, an ideal demolition contractor always trains his employees before getting them on the ground. 

Use Proper Equipment 

The proper tools are necessary for a demolition job to be done safely. This covers items such as gloves, safety goggles, hard hats, and earplugs. Any heavy machinery that will be utilized throughout the demolition process should also be properly used. 

It’s essential to use the right tools if you want to keep employees safe at the demolition site.  To prevent injuries and accidents, it’s also critical to guarantee that employees receive the necessary training on operating heavy equipment, such as bulldozers and excavators. 

Keep an Eye on the Weather 

It can be difficult or even impossible to carry out activities properly as weather has a major influence on demolition activities. For instance, strong winds can make it challenging to operate heavy equipment and can send debris flying into the air, endangering workers. Rain and other bad weather can also increase the risk of slips, trips, and falls at the demolition site. 

Keeping an eye on the weather prediction and modifying your preparations as necessary will help to ensure safety in any weather circumstances. This can include delaying demolition operations during severe weather or adopting additional safety measures to safeguard employees.

Know Your Surroundings

Another important aspect of demolition work is analyzing the surroundings. Being aware of the environment can help workers stay alert of threats and also warn people in the surroundings. The inspection of the neighboring environment can include: 

  • Falling debris 
  • Distance from Power lines 
  • Check for unstable structure 
  • Maintaining a safe distance for pedestrians 

Communicate Effectively  

Clear communication is critical as demolition sites are dangerous. For effective communication demolition contractors NYC ensure that all employees have communication devices and they are well trained for unwanted situations. Also, the assigning of tasks and responsibilities can also enhance better communication. 

Continuously Evaluate the Situation 

Demolition operations are unpredictable so anything can go wrong unexpectedly. So, it is important to assess the circumstances and change the safety strategy as needed. Continuously checking the situation can allow the contractor to detect an issue and solve it before it gets serious. Regular safety inspections are also necessary to make sure that all equipment is in excellent operating order and that employees are following the safety plan. 

Are You Looking for a Demolition Contractor? 

A good demolition contractor always follows rules and regulations for deconstructing a building. He will first ensure that the team is well-trained and no building is demolished before a proper analysis. Any kind of mismanagement can lead to injuries and other damages. 

Do you need a contractor to dismantle your building? Feel free to connect with Delta Demolition who are the best demolition contractors NYC.

Scroll to Top